5/11/17

Almost done with the dry dock on Ez Pickens.  The name should be finished tomorrow which was done with gold leaf and will be outlined in black and maybe grey..  Depends on Mitch..  Then clear coat over the top Saturday and splash Monday HOPEFULLY!